Facility Project List

Repairs, etc, needed on the church facility

Last updated : 8 January 2007




  

Projects In Progress

P Date Project Assignee Status
2 1/2/06 Ball field repairs Deacons, Gil Beaird Derrick Schindler will meet with Gil Beaird, Ron Martinelli, and Bruce Quinn-Briggs to develop a plan
3 4/17/06 Repair Little Angels driveway Need volunteers In planning phase
3 4/17/06 Replace drawer locks in office Bob Need to buy new locks
3 5/13/06 Plant/transplant bush in front of church to discourage short-cutting to parking lot Ron Martinelli In planning phase
2 5/13/06 Repair light standard in rear parking lot that has exposed wires. Ron Martinelli In planning phase
3 5/20/06 Replace/repair roof overhang adjacent to ice machine closet Need volunteers In planning phase
3 5/20/06 Paint exterior trim Bob Marshall, Ron Martinelli In planning phase (paint color, paint type)
3 6/29/06 Fill storage sheds Deacons Decide what goes where
3 6/29/06 Replace halogen lights that shine on exterior cross Need volunteers Design plan needed
3 7/9/06 Re-key all common locks Dave McGillicuddy Evaluating whether we can do it ourselves or whether we need to hire a locksmith
3 7/9/06 Relocate black storage cabinets from sanctuary storage closet Need volunteers Lots of junk in those cabinets, valuable storage space being wasted
2 8/2/06 Install shelves in storage room behind nursery Need volunteers See Jan Ristau/Jana McFarland/Barbara Marshall for details
2 8/11/06 Install new bathroom faucets throughout facility Need volunteers Parts already purchased, awaiting installation
1 8/13/06 Revamp air conditioning system at parsonage Deacons Dave McGillicuddy will evaluate requirements and obtain bids
1 9/23/06 Build fence at parsonage Gil Beaird, Bob Marshall Looking for volunteer to head up project
3 1/8/07 Fix dripping faucet outside office   Stripped screw makes it difficult to remove faucet

Completed Projects

P Date Project Assignee Status
1 2/14/06 Clean out storage shed in preparation for relocation Deacons Completed 3/23/2006
3 4/10/06 Re-cap riser outside office, remove cement block Bob Marshall, Ron
Martinelli
Completed 5/14/2006
1 3/23/06 Relocate storage shed Deacons, Doug Brown Completed 5/13/2006
1 4/17/06 Entire property needs weed-eating and mowing Deacons, mowing team Completed 5/27
1 6/22/06 Overhead projector not working Bob Marshall Completed 6/23 - air filter was clogged
1 5/6/06 Install new storage shed Deacons Completed 6/27/2006
2 6/21/06 Fix light fixture in breezeway Ron Martinelli Completed 7/1/06
1 7/13/06 Repair broken lock on office door Ron Martinelli, Dave McGillicuddy Completed 7/16/06
1 6/23/06 Replace ice machine Ron Martinelli Installed 8/3/06
1 6/30/06 Remove "junk" from area near old storage shed Deacons Complete
3 5/20/06 Install support posts along classroom/office corridor Ron Martinelli Completed 9/1/06
1 6/25/06 Fix loose light fixture in sanctuary Bob Marshall Completed 7/21/06
3 6/29/06 Paint storage shed Phil Dyck Completed 8/20/06
2 6/20/06 Replace carpet in parsonage Deacons Shampooed carpets instead
3 4/17/06 Repair non-functional fluorescent light fixtures in
1st/2nd grade classroom
Bob Marshall Completed 10/29/06
2 6/10/06 Install extra roof supports  Ron Martinelli Completed 1/1/07
2 5/1/06 Paint hand railing on Little Angels steps Phil Dyck Completed 1/8/07
2 6/29/06 Install shelves, work table, pegboard, tool hangers in shed Ron Martinelli Completed 2/12/07